Service

Change Search Parameters

Select Type of Resource

Tool

Methodology

Analysis/ Technical report

Guidance documents

Training

Case Studies/ Best Practices

Select Hot Topics

Financing and Management

Funding Incentives Project Management Asset Management

Knowledge and Support

Partnership Working Work with Residents Capacity Building

Architecture

Thermal Insulation Windows and Shading Air Tightness Environmental Design

Renewable Energies

Solar Thermal Solar Photovoltaic Other Renewables

Building Services

Heating and Hot Water Cooling Ventilation Electricity Saving Products Water Saving

Monitoring and Certification

Certification Monitoring

Select Language

Select Building Process Stage

National/regional strategy development

Organisational strategy development

Pre- design phase (appraisal and strategic briefing)

Design phase (project briefing)

Call for tender phase

Construction phase (construction briefing)

Commissioning phase

Use phase (occupancy briefing)

Maintenance and repair phase

Asset management

User involvement process

Resource: Practical Manual: BEEN Project Results, Including Detailed Findings and Recommendations

Name of organisation: Interreg III C project - ERDF - "BEEN" reviewed by Ekyl (EE)

Type of ressource: analysis/ technical report

Addressed barriers:

  • financial
  • skills/ knowledge gap
  • legislative

Addressed users:

  • building user (social housing organization)
  • building owner
  • design team
  • public decision maker

Language:

  • English
  • Estonian
  • German

Process stage:

  • national/ regional strategy development
  • organisational strategy development
  • maintenance and repair phase
  • asset management

Contact:

Capacity Building Thermal Insulation Solar Photovoltaic Solar Thermal Other Renewables Heating and Hot Water Cooling Ventilation

Description

Manual is a pdf- document to explain and assess the findings of BEEN addressing the issue of how to activate largescale energy-saving refurbishment measures for
prefabricated housing. 111 pages with tables and graphs.

Six sections:
1. Potential savings of energy-saving measures
2. Scope for financing energy-saving measures with regard to housing costs and income
3. Privatization of prefabricated housing and the capacity for action of the relevant
ownership types after privatization
4. Rules for reaching decisions about implementation of refurbishment measures
5. Cost-effectiveness of energy-saving measures under consideration
6. Experience with financing and funding of refurbishment measures

Implementation

The document is available for download in English, German and Russian from website http://www.been-online.net/Results.318.0.html?&L=72372

It explains the recommendations, problems and possibilities for increasing the initiative to refurbish prefabricated residential buildings in Central and Eastern European countries.

 

Information

Related Files
R_BEEN_1_1_EN.zip (716 kB)
R_BEEN_1_2_DE.zip (760.9 kB)
R_BEEN_1_3_russian.zip (877.4 kB)