Service

Change Search Parameters

Select Searchorder

Select Country

Austria Belgium Bulgaria Cyprus Czech Republic Germany Denmark Estonia Spain Finland France United Kingdom Greece Hungary Ireland Italy Malta Netherlands Lithuania Luxemburg Lativia Poland Portugal Romania Sweden Slovenia Slovakia
AT
BE
BG
CY
CZ
DE
DK
EE
ES
FI
FR
GB
GR
HU
IE
IT
MT
NL
LT
LU
LV
PL
PT
RO
SE
SI
SK

Select Hot Topics

Financing and Management

Funding Incentives Project Management Asset Management

Knowledge and Support

Partnership Working Work with Residents Capacity Building

Architecture

Thermal Insulation Windows and Shading Air Tightness Environmental Design

Renewable Energies

Solar Thermal Solar Photovoltaic Other Renewables

Building Services

Heating and Hot Water Cooling Ventilation Electricity Saving Products Water Saving

Monitoring and Certification

Certification Monitoring

Select Type of Project

Construction Refurbishment Other

Case Study: nZEC - Energy refurbishment of 41 dwellings in the residence Le Bois in Hérouville Saint Clair, France

Name of organisation: Groupe SNI - Plaine Normande

Stage of development: completed

Year of finalization: 2010

Type of project: refurbishment

Area: urban

Scale: individual buildings

Type of building: Apartment in a block of five or less stories

Number of units/dwellings: 41

Tenure: social rental

Street: Quartier Dubois

Postcode: 14200

City: Hérouville Saint Clair

Region/ County: Lower Normandy

Country: France

Last Update: 14.04.2015

Funding Project Management Certification Thermal Insulation Water Saving Solar Thermal

Short Description

The aim of this refurbishment project was to improve the energy performance of the building but also to improve the living environment of the tenants, and to decrease the heating bill for the tenants. Different sources of founding were solicited to assemble this project: ERDF funds, fundings from the Région, specific loans.


Key Elements

Certification

On a scale from A to G, the level of the building after refurbishment is C (the previous level was G), with  an annual consumption of 121kWh(primary energy)/m²

A: <50, B: 51<  <90, C: 91< <151, D: 151< < 230, E: 231< <330, F: 331< <451, G: >451

Certificate Qualitel Habitat&Environnement by Cerqual. This certificate is related to the compliance with some commitments:

  • Energy performances
  • Water and Electricity savings
  • Environmental management of the project
  • Cleaned building site
  • Choice of materials


Funding

The funding plan of this project involves ERDF funds (7%), regional funds (15%) but also specific loans (14%).

 

Costs

Statutory approvals

The costs dedicated to the preparation of the files for the obtaining of the statutory approvals are included in the costs of the pre-project studied (see below).

Design

 

Preliminary energy audit : 3 140 € without taxes

 

Pre-project studies (description of the building and the elements of the refurbishment programme, proposal of solution, designing layouts, projected budget…): 10 300 € without taxes

 

Project studies (more precise designing layouts, projected budget…) : 7 875 € without taxes

 

Global costs of the prime contracting: 57 090 € without taxes

 

Construction overall

 

Prelims

Scheduling, Leading and coordinating building teams : 4 500 € without taxes

Building services

Frontage lot: 376 422 € without taxes

External door and window lot: 137 470 € without taxes

Internal door and window lot: 125 043 € without taxes

Metal work lot: 36 276 € without taxes

Plumbing and ventilation lot: 317 428 € without taxes

Ventilation cost (per dwelling): 415 € without taxes

Solar installation (per dwelling): 7 317 € without taxes

Electricity lot: 104 219 € without taxes

Masonry lot: 22 590 € without taxes

Internal painting lot: 38 172 € without taxes

Tiling lot: 18 679€ without taxes

Low/zero carbon technologies

Solar installation (per dwelling): 7 317€ without taxes

Other

Anything not already covered in the above categories, specified if possible.

Consequential costs

Modifications were decided on during the construction phase.

Amendment 1: Global cost = 69437 € without taxes

Amendment 2: Global cost = -6840 € without taxes

Amendment 3: Global cost = 15040 € without taxes

VAT

5.5%



Thermal Insulation

In terms of thermal insulation of the buildings, the replacement of the windows by double-glazed windows, as well as the external insulation with 11cm of polystyrene enabled to eliminate thermal bridges and improve the outer shell of the building.


Solar Thermal

Solar panels were installed for the heating of domestic hot water.


Water Saving

Concerning water savings, equipment enabling water savings were set up in the dwellings (less consuming flushes, equipment for taps).


Project Management

It is important to stress that a preliminary energy audit was carried out and the prime contracting performed a diagnosis and wrote the tendering package.


Main Results

The level of energy consumption and the CO2 emissions of the building before refurbishment was:

  • Energy: 454 kWh/m²/year (level G)
  • CO2 emissions: 27 kgCO2/m²/year (level D)

The level of energy consumption and the CO2 emissions of the building after refurbishment is:

  • 121 kWh/m²/year (level C)


Lessons learned

Additional Information

Ms Carine Puyol
USH - The French Federation of Social Housing Providers
E-mail: carine.puyol@union-habitat.org
Web: www.union-habitat.org