Service

Change Search Parameters

Select Searchorder

Select Country

Austria Belgium Bulgaria Cyprus Czech Republic Germany Denmark Estonia Spain Finland France United Kingdom Greece Hungary Ireland Italy Malta Netherlands Lithuania Luxemburg Lativia Poland Portugal Romania Sweden Slovenia Slovakia
AT
BE
BG
CY
CZ
DE
DK
EE
ES
FI
FR
GB
GR
HU
IE
IT
MT
NL
LT
LU
LV
PL
PT
RO
SE
SI
SK

Select Hot Topics

Financing and Management

Funding Incentives Project Management Asset Management

Knowledge and Support

Partnership Working Work with Residents Capacity Building

Architecture

Thermal Insulation Windows and Shading Air Tightness Environmental Design

Renewable Energies

Solar Thermal Solar Photovoltaic Other Renewables

Building Services

Heating and Hot Water Cooling Ventilation Electricity Saving Products Water Saving

Monitoring and Certification

Certification Monitoring

Select Type of Project

Construction Refurbishment Other

Case Study: Genello- Compatible - Introduction of a EPC in social housing

Name of organisation:

Stage of development: design/ planning

Year of finalization: 0

Type of project: refurbishment

Area: urban

Scale: regional

Type of building:

Number of units/dwellings: 0

Tenure: social rental

Street: 11 Boulevard Brune

Postcode: 75682

City: Paris

Region/ County:

Country: France

Last Update: 27.04.2011

Funding

Short Description

The leader project LOGIREP provides 230 housing rehabilitation with AO design, production and guaranteed maintenance for 4 years. The aims established by the project are the 40%reduction of the actual energy consumption and the achievement of BBC Label: from 240 to 60 kWhEP / m². yr (75% calculation RT).
Moreover, the installation of the insulation envelop, ventilation and solar thermal works are provided by LOGIREP THROUGH AN Energy Performance Contract. LOGIREP undertakes the P2/P3 maintenance and the creation of 6 homes accessibility PMR.

Moreover, the Energy Performance Contract includes:
Design and achievements; maintenance during the work and four years maintenance after the conclusion of the work. The EPS does not provide P1.

Adjustment of degree day (DJU)
No contracts over the number of residents
• Year 1: probationary year without payment of bonus / malus
implementation of the GRS
• Annual audit year 2, 3 and 4 of the Agreement: maintenance on the meter RCU
• Outperformance: 50/50
• Under-performance: 100% penalty of the gap
• Unit price of energy fixed

Key Elements

Funding

Financial model optimized thanks to the tools of Grenelle;

Decree to share the savings of energy; ECO-lending 1.9 %; Complementary rents lied to over-densification, Grant Joint ADEME / FEDER; Certificates of Energy Economy, Conventional loans for functional  works.

 Estimated work cost of 9 million : 4milion euros of energetic work and 5 million euros in classical rehabilitation;

To be more specific  57% of the finances are due to the ECO-Pre; 14% to ECO-TFPB, 10% to tenants financment, 10% FEDER; ADEME  8 %. And only 1 % of CEE.
  

Main Results

The objectives of the project to  be achieved are :

40 % reduction of energy consumption;   Factor 4 – GES; developed REC solar thermal; disability access and a creation of a  possible commentary surface  for extension and innovation .

Lessons learned

 

It is too early to draw conclusions.

Additional Information

The tenant in the heart of the project;

   Developing a support tenants designed by social scientists

 • Welcome Booklet, general meetings and individual tenants relay

 • Sharing of best practices through a particular site Internet

 • An appropriate instrumentation and to assist individual tenants to control their consumption